What are steps for launching gantry to cross piers?

FAQ 一 11, 2013 What are steps for launching gantry to cross piers?已关闭评论

Walking type launching gantry is a special bridge construction equipment for highway construction. With step by step, it crosses piers to prepare for gider installation. Below steps for crossing piers for your reference:

launching gantry

launching gantry

Read more »

What are ZZHZ quality control measures?

FAQ 一 08, 2013 What are ZZHZ quality control measures?已关闭评论

Launching gantry demands a high quality as special bridge construction equipment. To be responsible for workers and equipment, ZZHZ adopts below quality control measures:

ZZHZ launching gantry

ZZHZ launching gantry

Read more »

Why ZZHZ need a longer production date for a launching gantry?

FAQ 一 07, 2013 Why ZZHZ need a longer production date for a launching gantry?已关闭评论

ZZHZ is one of China leading manufacturers to produce high quality launching gantry for highway and high speed railway. With annual productivity 10 sets, ZZHZ launching gantries have been exported to at least 10 countries and receive good reputation.

Launching gantry

Read more »

How to inspect the frequency converter of the launching gantry?

FAQ 一 05, 2013 How to inspect the frequency converter of the launching gantry?已关闭评论

As using the frequency converter, watch the followings everyday:

ZZHZ launching gantry

ZZHZ launching gantry

Read more »

What are safety control system of launching gantry?

FAQ 十二 26, 2012 1 Comment

Launching gantry safety control system ensures the equipment and peronnel safety, it palys a crucial part in the working process. Here let’s briefly introduce them.

launching gantry

launching gantry

Read more »

What are Main Technical Parameters for HZP450t Segmental Assembly Bridge Girder Launching Gantry?

FAQ 十一 24, 2012 What are Main Technical Parameters for HZP450t Segmental Assembly Bridge Girder Launching Gantry?已关闭评论

working steps for standard span

segmental assembly bridge girder launching gantry

segmental assembly bridge girder launching gantry

Main technical parameters

No. Item Technical parameters
1 Max lifting capacity 50t
2 Lifting height 25m
3 Span 30m
4 The whole machine working level A3
5 Longitudinal slope ±2.0%
6 Lateral slope ±2.0%
7 Min curve radius at working 2500m
8 Girder-feeding method Finish girder-feeding on the bridge floor at rear part and lower part of the launching girder
9 Applicable segment length (7-9)m
10 Segment height/width 1.7m×3.25m
11 Max segment weight(without spreader) 43t
12 Max lateral moving speed of launching girder 0-0.5m/min
13 Longitudinal moving speed of launching girder 0-1.0m/min
14 Spreader rotation 360°
Spreader cross adjustment degree ±4%
Spreader longitudinal adjustment degree ±4%
15 Lifting trolley number 1
Cross adjustment distance ±0.9m
Lateral moving speed 0~1.0m/min
Longitudinal moving speed 0~15m/min
16 Main girder number/length 2/36m
17 Auxiliary front leg number 1
18 Front leg number 1
19 Rear leg number 1
20 Auxiliary rear leg number 1
21 10t auxiliary trolley number 1
22 Out dimension of launching girder at working  (length x width x height) 65×9m×13m
23 Total power AC/380V/ 3-phase,5 wires,about 220kw
24 Total weight About 550t

Accidents Points for Launching Gantry in the Bridge Construction Process

FAQ 十 23, 2012 Accidents Points for Launching Gantry in the Bridge Construction Process已关闭评论

To effectively prevent, timely control and eliminate the damage caused by sudden accident in the bridge construction process, reduce loss caused by the accident to a maximum extent, maintain interest of society and enterprise, ensure human and property safety, ZZHZ makes a series of measures to manage the launching gantry working.

launching gantry

launching gantry

Read more »

What Factors Will Decide the Price of Launching Gantry?

FAQ 十 22, 2012 What Factors Will Decide the Price of Launching Gantry?已关闭评论

The launching gantry is an equipment to install precast girder on prefabricated piers, making a huge contribution to bridge construction in China. With fast development of high speed railway, more and more launching gantry is widely used in the high speed railway construction. While price of launching gantry is quite different with larger fluctuation, why does it happen? Below is a simple analysis from ZZHZ:

launching gantry

launching gantry

  1. Different brand. Famous brand has better quality warranty, more considerate service and more guarantees compared with small factories. That makes a difference.
  2. Different type. According to different demands, each type for one customer group. Different needs, different type, then different cost leads to type difference.
  3. Old or new equipment. New equipment usually uses new technology and better spear parts which cause a rise of cost and expensive price. As time goes on and launching gantry prevails, the price will decline gradually.

 

?Keeping innovation and pursuing excellence? are critical concept of ZZHZ, friends from all of the world are warmly welcome to visit ZZHZ, we will be at your service anytime.

What are Advantages of Walking Type Launching Gantry?

FAQ 十 21, 2012 What are Advantages of Walking Type Launching Gantry?已关闭评论

Walking type launching gantry is a new type of bridge construction crane fabricated to meet demands of market and actual working condition, combined with current successful experience of ZZHZ and other companies. It features:

 

walking type launching gantry

walking type launching gantry

Read more »

The Fabrication Process of Bridge Girder Launcher

FAQ 九 23, 2012 The Fabrication Process of Bridge Girder Launcher已关闭评论
Bridge Girder Launcher

Launching Gantry

a. the bridge girder launcher mainly uses Q235B steels: the butt welds of cover board and web board, the outer lead weld of cover board and web board adopts Lincoln weld, other welds use CO2 gas shielded welding; welding material: welding rod of Lincoln weld H08A, and HJ431; welding rod of CO2 gas shielded welding: ER50-6; the electrode of tack welding uses J422 when the machine is assembled. The 100% ultrasonic inspection should be done for butt welding, the acceptance standard is GB11345-89, and the grade of welding quality is I grade; the welds between cover board and web board adopt melt thru weld, the 100% ultrasonic inspection is done after welded, and I grade is qualified. All of T joints do X-ray detection, the acceptance standard is GB3323-87, and the grade of welding quality is II grade.

Read more »