The protective measures for the electrical system of the MSS
The movable support system (MSS) is a large-scale construction equipment. The necessary protective measures for the electrical system not only improve the construction safety, but also guarantee the personnel security.
Check the accident-prone points of the launching gantry
In order to effectively prevent, control and eliminate the damages by the sudden accidents happening in the bridge-erection process, reduce the losses by the accidents to the large extent, maintain the social and enterprise business interest, protect the personnel and property security, we should develop a series of management measures aiming to the possible incidents.
The types and characteristics of launching gantry in China
1, The types
a, According to different construction methods, it consists of the field-casting and field segmental assembly.
b, It divides into the movable supporting system and movable standing system in light of carrying the mould plate or not. For the movable supporting system, we cast the concrete girder on site. However the movable standing system is to assemble the pre-cast segmental concrete girder on the machine.
c, It consists of the upstroke movable supporting system and downstroke movable supporting system according to the piers position.
Nowadays the upstroke movable supporting system is the most popular one.
660T Downstroke MSS Bridge Creating Machine
1, The applicable scope and purpose
MSS30/660 Bridge Creating Machine is designed for meeting the demands of 30m continuous concrete box-girder construction. It is a bridge construction machine whose construction method is that installing on the piers and field casting. The main characteristics are high rigid for main girder, convenient bracing installation, variable piers.
How to install bridge girder launcher safely?
1. Organization measure
Set up safety leading group headed by general manager. Group leader and group members
2. Safety training measure to install the boundary beam
A. in accordance with related rule formulates safe operation implementing regulations. Have a safety technology disclosure to construction personnel and
Carry out safety education
B. Organize constructor to have a safety technology training and assessment before installing girders. Therein, for special type of constructor, they must be employed with the certificate, for all who participate in installing the boundary beam and access to the worksite; it is needed to wear safety protective equipment.
How to operate the bridge girder launcher?
The bridge girder launcher which generally have four construction steps to erect one girder: feed-in girder, bundle girder, lift girder and drop girder is designed and manufactured by ZZHZ. (1)Feed-in girder 1.Before feeding-in girder, check rear part support of bridge construction machine to avoid excessive subsidence at rear part of the machine when feeding-in girder 2.As transporting girder, there should have someone to pay attention to support to avoid colliding with bridge construction machine. And there should have someone to be responsible for operating girder transporter 3.As transporting girder, it is forbidden to have workers standing on rear part of the girder or scaffold floor to avoid falling objects hurting someone 4.When bridge construction machine begins to feed girder, the girder transporter should push in the girder slowly. At the meantime, appoint someone to watch it so that the girder will not collide with transporter or bridge construction machine
900T Upstroke MSS Bridge Creating Machine
1, Applicable scope and purpose: MZ900s Upstroke MSS Bridge Creating Machine is an exclusive equipment for the 32m continuous box girder field casting construction in the railway passenger transportation line project. 2, The main characteristics and advantages: a, This machine can realize the moving from one pier to next pier by itself, without other auxiliary facilities on the ground. It owns the characteristics of high mechanical degree, safety and reliability. b, Equip with the ceilings of rain-proof and sunscreen, the machine can operate in any time and any weather to improve the working efficiency and guarantee the construction period. c, While erecting the continuous girder or transferring, we just need to expand the side mould frame and base mould. There is no need to dismantle the whole machine in order to improve the transferring efficiency. d, We stick to the symmetrical design principles for the main girder and mould frame. So if there is the two-way construction condition, we just need to replace the position of the front guide girder, front and rear support leg, auxiliary support legs.
e, The machine can accomplish the segmental assembly erection of 32m box girder without making the adjustment on the main girder and support leg mechanism.
The classification of launching gantry
It is a bridge construction machinery which moves along the pre-laying rails to erect the concrete girders. Because of its high efficiency, its design principle has been considered fully in the designing process of the China Railway Bridge Girder. It owns the large body and has exceeded the railway transportation limit, so it must be dismantled while delivering. After arriving at the construction site, we will assemble and install before it’s been put into practice.
HZQ Launching Gantry Integrating Carrying and Erecting Functions
ZZHZ is a professional manufacturer of hoisting machinery, the main products include all kinds of launching gantry, gantry crane which are widely used in the highway construction projects. The honeycomb girder launching gantry made by our company is welded by the honeycomb steel plate and triangular web plate. The overall shape is triangle. Compared with the box girder, it owns the characteristics of lower gravity center, light weight, safe and good wind-resistance. Compared with the truss girder, it owns wide welding contact surface and the suffered force is even. When the truss girder suffers the force, the load-bearing points are the channel steel welding points and easy to mechanical deformation. Therefore, the honeycomb girder owns the characteristics of light deflection and high rigid intensity. The connection method between the two girders is the pin-connecting. While assembling the machine, just entering the six steel pins is enough. In this way the assembly period is short. Usually it only takes a week to install the whole set of launching gantry.
Steps to Install Girders for HZQ50/150 Bridge Girder Launcher
After researching and analyzing current highway?bridge girder launcher?at home and abroad, combining with our successful experience, ZZHZ develop and produce HZQ50/150 walking type bridge construction machine according to practical situation.