How about bracket for crossing spans of HZP1600 launching cranes?

FAQ 四 10, 2013 How about bracket for crossing spans of HZP1600 launching cranes?已关闭评论

Bracket for crossing spans of HZP1600 segmental assembly launching cranes refers to a bracket connecting cantilever beam and suspended beam and transmitting loads from suspended beam.

segmental assembly launching crane

segmental assembly launching crane

Read more »

What are technical parameters of hydraulic system of HZP1600 launching crane?

FAQ 四 08, 2013 What are technical parameters of hydraulic system of HZP1600 launching crane?已关闭评论
Item Hydraulic systems of

front and rear support leg

Hydraulic systems of

front and rear auxiliary support leg

Overhead crane transverse hydraulic system Sling adjusting hydraulic system
Oil pump working pressure 28MPa 25MPa 25MPa 25MPa
Rated flow of oil pump 13.2L/min 13L/min 13L/min 6.5L/min
oil pump motor power 11kw 7.5kw 7.5kw 4kw
Oil tank volume 320L 140L 130L 85L
Power supply AC380V/50Hz AC380V/50Hz AC380V/50Hz AC380V/50Hz
Oil cylinder working pressure 28MPa 28MPa 25MPa 25MPa 25MPa 25MPa
Oil cylinder capacity 350t 105t/80t 63t/44t 38t/18t 50t/34t 40t/40t
Oil cylinder operating stroke 350mm 1200mm 500mm 1100mm 1600mm 300mm
Remark Jacking Longitudinal moving Transverse moving Auxiliary support leg Lifting trolley Hanging

How about hydraulic system of HZP1600 segmental assembly launching girder?

FAQ 四 02, 2013 How about hydraulic system of HZP1600 segmental assembly launching girder?已关闭评论

Hydraulic system of HZP1600 segmental assembly launching girder includes 8 sets hydraulic station, 8 sets jacking cylinders for front and rear support legs, 4 sets longitudinal cylinders for front and rear support leg, 2 sets lateral cylinder for front and rear support leg, 4 sets jacking cylinders for auxiliary front and rear support legs, 4 sets lateral cylinders for overhead gantry crane and 4 sets cylinders for sling adjustment.

HZP1600 segmental assembly launching girder

HZP1600 segmental assembly launching girder

Read more »

How about 10t overhead crane of segmental assembly launching girder?

FAQ 四 01, 2013 How about 10t overhead crane of segmental assembly launching girder?已关闭评论

10t overhead crane is of auxiliary work equipment of launching girder to lift small type articles on the bridge deck, as well as move in the length scope of main frame as walk platform between left and right main frame.

Read more »

What is suspender of HZP1600 segmental assembly bridge girder launcher?

FAQ 三 29, 2013 What is suspender of HZP1600 segmental assembly bridge girder launcher?已关闭评论

Suspender of HZP1600 segmental assembly bridge girder launcher is hanged on the hanging beam at inside of main girder

segmental assembly bridge girder launcher

segmental assembly bridge girder launcher

Read more »

What is sling of HZP1600 segmental assembly bridge girder launcher?

FAQ 三 28, 2013 What is sling of HZP1600 segmental assembly bridge girder launcher?已关闭评论

The sling of HZP1600 segmental assembly bridge girder launcher can realize 360?turning and 4% gradient adjustment.

segmental assembly bridge girder launcher

segmental assembly bridge girder launcher

Read more »

What protection devices are set for overhead gantry crane?

FAQ 三 27, 2013 What protection devices are set for overhead gantry crane?已关闭评论

To adapt to special working environment for HZP1600 segmental assembly bridge girder launcher, below automatic protection devices are set for overhead gantry crane for lifting girders:

segmental assembly bridge girder launcher

segmental assembly bridge girder launcher

Read more »

What is introduction on overhead gantry crane for HZP1600 segmental assembly bridge girder launcher?

FAQ 三 26, 2013 What is introduction on overhead gantry crane for HZP1600 segmental assembly bridge girder launcher?已关闭评论

Overhead gantry crane for HZP1600 segmental assembly bridge girder launcher is made up of crane moving mechanism, metal structure, lifting system, hydraulic system, power supply system and electrical system

HZP1600 segmental assembly launching girder

HZP1600 segmental assembly bridge girder launcher

Read more »

How about main girder of HZP1600 segmental assembly launching girder?

FAQ 三 25, 2013 How about main girder of HZP1600 segmental assembly launching girder?已关闭评论
main girder of launching girder

main girder of launching girder

HZP1600 segmental assembly launching girder main girder is of steel box girder structure, made up of upper and bottom layer, connected by bolts in the middle. Total length of main girder is 58m, 5 sections in total, therein 11.75m long, 2 sections; 11.5m long, 3 sections. Main girder features simple structure, high stiffness, mature fabrication technology and other advantages.

Upper cover plate of main girder is equipped with rails for gantry crane and 10t overhead crane, space between two rails can be regards as working platform and cables laying platform for gantry crane and 10t overhead crane. Longitudinal slide-ways are arranged at two sides of bottom cover plate separately, longitudinal sliding rail at middle part. Hanging longitudinal girder is set up on top flange at inside of main girder

Upper and bottom connection beams are arranged on both ends of main girder.

What is guide beam of HZP1600 segmental assembly launching girder?

FAQ 三 23, 2013 What is guide beam of HZP1600 segmental assembly launching girder?已关闭评论

Front and rear guide beams of HZP 1600 segmental assembly launching girder are arranged symmetrically, two types of truss in total, two sections 9.7m long, one section 6.6m long.

HZP1600 segmental assembly launching girder

HZP1600 segmental assembly launching girder

Read more »