What are necessary preparation parts before bridge girder installation?
There are two necessary preparation parts for bridge girder installation according to ZZHZ, please take the following before using a launching gantry to install girders as a reference:
Part 1: Construction conditions in the worksite
1. Bridge piers;
2. Precast girders
3. Abutment (0# abutment): make a solid and smooth road bed for installation and commissioning of the launching gantry on the abutment. The length of road bed for 0# abutment is equal to or more than that of the launching gantry.
4. A special way for tyres girder carrier from girder fabrication yard to 0# abutment, for the convenience of girder feeding at rear part of the launching gantry.
Part 2: Installation equipments in the worksite
Crane with lifting capacity > 20t 1 set
Φ19.5 steel wire rope8m 4 ropes
Sleeper some sleepers
Electric welder 1 set
Oxygen, acetylene 1 set
Steel hammer (12 pounds, 8 pounds) 1 piece for each
Wrench, pincher several pieces
Gradienter 1 set