The bridge building crane often perform in the air, an improper measure may bring in serious result. The technician from Zhengzhou Huazhong Construction Machinery Co., Ltd will tell you the following tips:
The bridge building crane is a kind of equipment that places the precast girder on the bridge pier. And it is also a kind of lifting crane, because its main function is to lift the girder and then place online casino the girder in the right place.
1.The model of the bridge building crane should meet the need of the construction structure. Before it is being put into operation, it should be checked by the relative authority and gain relating certificates.
2.The stress-bearing parts of the bridge building crane should be checked and proved by the experts.
3.The protection of the bridge side face should be taken.
4.Each connecting part of the bridge building crane should be checked.
5.The trail of lifting objects should be done after the assembly of the bridge building crane is completed.